tcs-ms website online

16.8.13 new website gone live!

tcs-ms represents GTW

26.7.13 tcs-ms and GTW GmbH Alpen from Alpen-Germany sign representation agreement for the Benelux.   

tcs-ms represents           WELTER zahnrad GmbH

15.7.13 tcs-ms and Welter zahnrad GmbH from Lahr/Schwarzwald-Germany sign representation agreement for the Benelux.

tcs-ms represents
 CAVEX GmbH & Co. KG

15.7.13 tcs-ms and CAVEX GmbH & Co. KG from Ofterdingen-Germany sign representation agreement for the Benelux.

     

Share in social media


Rotor and hot section overhaul for French owned IPP in western Africa

Following an incident during operation of a Frame 6 gas turbine the turbines compressor needed extended repair.

In extended discussions with the operator, the owner, the insurance representatives and the service providers technical support team, the damaged parts were brought to Europe for extended inspection, the root cause of the damage was established and an extended repair schedule agreed with all concerned parties.

The rotor and a series of hot section parts were repaired as per latest manufacturer’s specification and returned to the African plant for re-assembly.

 

 

 

 

 

 

 

more references